pvn,
You are correct! There was a typo in my previous post. Below is the corrected version substituting 3 hours for 6. The expected number of overlaps did not change when I made the correction.

We really should do a simulation.

---- corrected post -----

uuDevil,

I think your method underestimates the number of overlaps because it implies that failures start exactly on a three hour boundary.

Here is a second method for estimating the number of overlaps. Suppose there are exactly 400 failures. We will say that the ith failure and the jth failure overlap if their start times differ by 3 hours or less. The probability that the ith failure overlaps the jth failure is approximately

6/(24*356) = 0.000684932.

There are 400*399/2 = 79800 possible pairs of i's and j's, so the expected number of overlaps (with "overlap" defined as above) is

6/(24*356) * 400*399/2 = 54.6575.
Reply With Quote
  #2  
Old 08-05-2005, 07:51 PM
tylerdurden tylerdurden is offline
Junior Member
 
Join Date: Jan 2004
Location: actually pvn
Posts: 0
Default Re: Oops - correction

[ QUOTE ]
uuDevil,

I think your method underestimates the number of overlaps because it implies that failures start exactly on a three hour boundary.

Here is a second method for estimating the number of overlaps. Suppose there are exactly 400 failures. We will say that the ith failure and the jth failure overlap if their start times differ by 3 hours or less. The probability that the ith failure overlaps the jth failure is approximately

6/(24*356) = 0.000684932.

There are 400*399/2 = 79800 possible pairs of i's and j's, so the expected number of overlaps (with "overlap" defined as above) is

6/(24*356) * 400*399/2 = 54.6575.

[/ QUOTE ]


I came up with a similar number in a different manner.

As uuDevil pointed out, The expected number of failures in a three hour period is 400/(24*365/3)=.137

We expect to have 400 failure events (averaging three hours each) in a year. During each one of those, the probability that another machine will fail is 0.137.

Now if we take 400*0.137 = 54.8. However, that means we'd actually have 454.8 failures, not 400 (we're counting duplicates twice.

We just need to solve this for x: (x*0.137)+x=400

That gives us x=351.8. 351.8 single failure events.

351*0.137=48.2

48.2 overlapping events.

351.8+48.2=400.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:19 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.